The First Section Of Wall Complete!
This is the wall of the house inside and out! Thank you Drew and Roper for helping!
We waited a day for the concrete to set and then we peeled the forms. Kylee was really helpful she worked all day long.
Drew and Lance held the hose and directed the concrete. The hose was pretty heavy full of all of the mud.
We pumped the concrete into the forms through a little pump truck.
We waited a day for the concrete to set and then we peeled the forms. Kylee was really helpful she worked all day long.
Drew and Lance held the hose and directed the concrete. The hose was pretty heavy full of all of the mud.
We pumped the concrete into the forms through a little pump truck.
Monday, July 6, 2009
This Weeks Progress
While we were busy working Kylee made mud pies. I think they are her new favorite treat.
We then put the forms together. We lined up conduit and all thread and tightened eight brackets onto each sheet of plywood. We are almost ready to pour the first section of the house wall.
This week was a lot of work getting the walls formed and ready to pour. Bruce put in all of the foam insulation in between the rebar.
We then put the forms together. We lined up conduit and all thread and tightened eight brackets onto each sheet of plywood. We are almost ready to pour the first section of the house wall.
This week was a lot of work getting the walls formed and ready to pour. Bruce put in all of the foam insulation in between the rebar.